Saturday, March 25, 2017
Trailer Progress
The wheel wells have been riveted to the exterior aluminum skins. The piece that supports part of the entry step was also riveted into position, and the area of steel channel where the shocks had been attached got a fresh coat of paint. All this work clears the way for more plywood floor to go in once some work on the belly skins is wrapped up and the wiring for the brakes is done. That should be fairly straightforward work, probably to be wrapped up by Tuesday. Then new plywood goes in, and the last of the old plywood comes out. Pictures when I have a chance.
Labels:
trailer
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment